**All curbs requiring replacement under this Section shall be replaced with a new curb: The sellers of real property in the Township shall replace any curb, curb segment or curb section that: contains structural cracks or structural defects or has a deviation in elevation between curb segments or sections in excess of ¾ inch, or has deteriorated or has a reveal of less than three inches (3") as measured from the road surfaces to the top of the curb. The seller of the property shall replace any sidewalk and walkway segment or sections which contain structural cracks (a crack that is entirely though the concrete) or have a deviation in elevation between blocks in excess of ¾ inches or have a substantial defect. Detectors must be mounted inside sleeping area.Īny sump pump or floor drain connected to the public sanitary sewer system must be disconnected and discharged to the outside of property without causing an icing condition on a public right of way.Īny plumbing fixture located below street level and connected to the public sanitary sewer system must have a backwater valve installed. Must be at least 4 inches (4") high, clearly visible from the street, with sufficient contrast so as to be easily read in inclement weather and at night.Īre to be installed in the hallway on any floor wherever bedrooms are.Īt least one per level, including attics if stair access is present, and at least one per sleeping unit. It should however serve as a guide to help owners prepare properties for sale.

haverford township building permits

This is NOT a substitute for the appropriate documents, nor is it all inclusive. The checklist below is provided to assist property owners, realtors and agents in anticipating the items which must be brought into compliance with the requirements of OrdinanceĢ532 & 2625-2011 & 2013 and the International Property Maintenance Code 2018, reference therein, prior to the issuance of a Certificate of Use and Occupancy. If the sale of property has been terminated for any reason, the Township of Haverford must be notified.

haverford township building permits

Please note: The Application for Certificate of Use and Occupancy MUST be filed at least 30 days prior to settlement.










Haverford township building permits